top of page

Prep Stations

$0.00Price
Quantity
Expected Lead Time, ~ 9 Weeks
  • Available in open-face and enclosed prep station configurations
  • Designed for sanding, priming, and surface preparation
  • High-efficiency airflow for superior dust and overspray capture
  • Energy-efficient ventilation systems
  • Bright LED lighting for improved visibility and finish quality
  • Premium multi-stage filtration for cleaner air and longer filter life
  • Custom sizes and configurations available
  • Optional heated make-up air systems
  • Vehicle and industrial equipment applications
  • Integrated control panels for simple operation
  • Engineered to meet NFPA and applicable local code requirements
  • Manufactured in the USA
  • Professional installation, startup, and nationwide service available

    © 2024 by Big D International

    bottom of page